2 storey new build school classroom complex to help expand the school from 2 to 3 form entry.
Key Features
Constructed from a steel frame and composite floor allowed the frame to nbe erected in 8weeks.
Steel frame design including connection design.
Areas of clear spanning to allow for future flexibility.
Key Features:
Constructed from a steel frame and composite floor allowed the frame to nbe erected in 8weeks.
Steel frame design including connection design.
Areas of clear spanning to allow for future flexibility.