MARK & PARTNERS
| Civil and Structural Engineers
+
about
+
projects
+
people
+
contact
+
show all
+
show all
+
private homes
+
residential
+
commercial
+
everything else
+
show all
+
private homes
+
residential
+
commercial
+
everything else
Back
School Extention
2 storey new build school classroom complex to help expand the school from 2 to 3 form entry.
Key Features
Constructed from a steel frame and composite floor allowed the frame to nbe erected in 8weeks.
Steel frame design including connection design.
Areas of clear spanning to allow for future flexibility.
Key Features:
Constructed from a steel frame and composite floor allowed the frame to nbe erected in 8weeks.
Steel frame design including connection design.
Areas of clear spanning to allow for future flexibility.
© 2024 Mark and Partners Limited
Made by: